Anjungan pengeboran Wirth B10A yang diiklankan telah terjual dan tidak disertakan dalam pencarian!
Iklan yang serupa
anjungan pengeboran Bohak P1002 Bohak P1002 €10.000 Anjungan pengeboran 1998 5000 m/h Jerman, Meinersen
anjungan pengeboran Klemm KR806-3 Klemm KR806-3 harga berdasarkan permintaan Anjungan pengeboran 2000 13000 m/h Jerman, Metten
anjungan pengeboran Wirth B10A
Sudah dijual
anjungan pengeboran Wirth B10A
anjungan pengeboran Wirth B10A gambar 2
anjungan pengeboran Wirth B10A gambar 3
anjungan pengeboran Wirth B10A gambar 4
anjungan pengeboran Wirth B10A gambar 5
anjungan pengeboran Wirth B10A gambar 6
anjungan pengeboran Wirth B10A gambar 7
anjungan pengeboran Wirth B10A gambar 8
anjungan pengeboran Wirth B10A gambar 9
anjungan pengeboran Wirth B10A gambar 10
anjungan pengeboran Wirth B10A gambar 11
anjungan pengeboran Wirth B10A gambar 12
anjungan pengeboran Wirth B10A gambar 13
anjungan pengeboran Wirth B10A gambar 14
1/14
Merek:  Wirth
Model:  B10A
Tipe:  anjungan pengeboran
Tahun pembuatan:  1999
Jam operasi:  5000 m/h
Lokasi:  Jerman 10318
Dipasang pada:  lebih dari 1 bulan
Machineryline ID:  FD24922
Mesin
Merek:  KHD F121413F
Kondisi
Kondisi:  bekas
Detail selengkapnya
Warna:  oranye

Detail selengkapnya — Anjungan pengeboran Wirth B10A

Jerman
Mast Length: 18.8 m
Type: Exploration Drill Rig, Water Well Drilling Rig
Motor Type: KHD F121413F
Hoisting Force: 127 kN
Regulary Hook Load Capacity: 100 t
Accessories not included in the price:
- two trailers, each loaded with 21 Wirth double-wall screwable reverse-circulation 9 m drill pipes of outer Ø 311 mm and inner Ø 211 mm.
- 1,300 m of 5" x 4-1/2" IF API R II Drill Pipe
- three Drill Collars
- Drill Pipe Handling Unit for mounting and dismounting of drill pipes
- two Wirth Duplex Mudpumps 7-1/4" x 16" with Power Pack
- BOP Stack with Accumulator
- one Shaleshaker
- one Desilter
- misc. Substructure Pieces
Drilling Applications:
- Exploration Drilling up to 1,500 m
- Geothermal Drilling
- Water Well Drilling
- Deep Hole Drilling
This machine was completely overhauled in 2013.