Machineryline » Peralatan industri bekas » Peralatan industri lain Wire coating machine

Peralatan industri lain Wire coating machine

PDF
peralatan industri lain Wire coating machine
peralatan industri lain Wire coating machine
peralatan industri lain Wire coating machine gambar 2
peralatan industri lain Wire coating machine gambar 3
peralatan industri lain Wire coating machine gambar 4
Tertarik dengan iklan?
1/4
PDF
Harga:
berdasarkan pemintaan
Buat penawaran harga
Hubungi penjual
Tipe:  peralatan industri lain
Tahun pembuatan:  2012
Lokasi:  Jerman Cologne
Dipasang pada:  5 Jul 2024
ID stok penjual:  00078
Kondisi
Kondisi:  bekas

Detail selengkapnya — Peralatan industri lain Wire coating machine

Jerman
Preis: Contact us for price
Marke: Wire coating machine
Wire coating (From a Plant for fire aluminizing steel wire)
The wire coating takes place in the coating device. The coating device is connected to the dosing oven via the riser pipe. The coating device consists of the pre-chamber
the coating tank
the nitrogen stripping device and the cooling device. The coating tank is closed by a movable cover. The pre-chamber
the coating tank and the covers are heated electrically. The temperature in the processes is adapted to the melting temperature of the dosing furnace. The temperature is measured via 2 redundant NiCrNi thermocouples in the pre-chamber
2 redundant thermocouples in the heating of the coating tank
2 redundant thermocouples in the heating bonnet of the coating chamber. The thermocouples query the respective process temperature. The heaters are controlled via setpoint - actual value comparison
The pre-chamber is the connection between the coating part and the inductive preheating. The pre-chamber is sealed gas-tight
forming gas (95.5 % nitrogen
4.5 % hydrogen gas) is fed into the pre-chamber) The forming gas has a weak reducing effect on the red-hot wire and acts as a protective gas to prevent oxidation of the red-hot wire The gas is discharged at the inlet openings of the inductor. The gas overpressure in the pre-chamber is preset manually using a control valve and can be read visually on a pressure gauge. In the pre-chamber there are guide nozzles axially aligned with the actual nozzles of the coating device
The coating nozzles of the coating device are mounted 12 times on a nozzle carrier and are used as a unit. The internal diameter of the nozzles is adapted to the wire diameter. The nozzles prevent molten aluminium from escaping from the actual coating tank
on the outlet side
the nozzles wipe off the excess aluminium. After filling the coating tank with molten aluminium (see A04)
a side channel compressor creates a vacuum above the molten aluminium in the coating tank. The vacuum prevents excess aluminium from escaping from the nozzles
thus influencing the thickness of the aluminium layer on the wire. In the event of a possible wire breakage
the vacuum prevents the molten material from escaping from the free nozzles
The vacuum is adjusted to the metallostatic pressure in the coating tank and the required layer thickness on the wire. The filling of the coating tank is monitored and controlled by 2 redundant distance sensors. The temperature control and monitoring of the heating is carried out via renundant thermocouples
The front cover of the coating device can also be opened during coating operation for the purpose of inspection
slag removal and monitoring. The coating device always remains closed during coating operation. The operating states of the coating device are monitored and controlled by sensors for temperature
fill level and vacuum. Control is centralised via the DCS (process control system). The replenishment of used molten material through the wire coating is carried out automatically by the filling level monitoring in the coating chamber and pressure increase in the dosing furnace through the riser pipe. When the system is stopped or the nozzles need to be changed
the excess pressure in the dosing furnace is released and the coating chamber empties into the dosing furnace through the riser pipe
There is an inspection opening with a sealing cone in the coating tank. When the system is stopped
the inspection opening can be opened and contaminated residual melt can be drained from the coating tank. In heating and coating mode
nitrogen gas is introduced into the coating device at an overpressure of 5 mbar as oxidation protection to prevent oxidation of the graphite material in the coating tank. The coated wire is cooled atmospherically after exiting the coating chamber. If necessary
the coating thickness can be reduced and levelled using nitrogen stripping nozzles. With the stripping nozzles it is possible to control the coating thickness of each wire independently
If necessary
the device can be swivelled completely out of the line
Find more here
tampilkan kontak
Penting
Penawaran ini hanya sebagai pedoman. Silakan tanyakan informasi secara persis dari penjual.
Tips pembelian
Tips keamanan
PDF
Menjual mesin atau kendaraan?
Anda dapat melakukannya dengan kami!
Iklan yang serupa
peralatan industri lain Metall & Plastic GmbH IS-4022165 peralatan industri lain Metall & Plastic GmbH IS-4022165
2
Hubungi penjual
harga berdasarkan permintaan
Tahun 2013 Mil Daya
Jerman, Cologne
peralatan industri lain Vitronics Soltec mySelective 6746 peralatan industri lain Vitronics Soltec mySelective 6746
2
Hubungi penjual
harga berdasarkan permintaan
Tahun 2011 Mil Daya
Jerman, Dresden
Hubungi penjual
harga berdasarkan permintaan
Tahun 2011 Mil Daya
Jerman, Regensburg
Hubungi penjual
harga berdasarkan permintaan
Tahun 2012 Mil Daya
Jerman, Menslage
peralatan industri lain Nutek NTE 0710 UL peralatan industri lain Nutek NTE 0710 UL peralatan industri lain Nutek NTE 0710 UL
3
Hubungi penjual
harga berdasarkan permintaan
Tahun 2011 Mil Daya
Jerman, Berlin
Hubungi penjual
harga berdasarkan permintaan
Tahun 2013 Mil Daya
Jerman, Berlin
Hubungi penjual
harga berdasarkan permintaan
Tahun 2015 Mil Daya
Jerman, Munich
peralatan industri lain Nutek NTM910 TVL-1500-1 peralatan industri lain Nutek NTM910 TVL-1500-1
2
Hubungi penjual
harga berdasarkan permintaan
Tahun 2013 Mil Daya
Jerman, Berlin
peralatan industri lain 2009  Conveyor professional pack
1
Hubungi penjual
harga berdasarkan permintaan
Tahun 2009 Mil Daya
Jerman, Pullach
Hubungi penjual
harga berdasarkan permintaan
Tahun 2016 Mil Daya
Jerman, Frankfurt
peralatan industri lain Laif L1100 PP
1
Hubungi penjual
harga berdasarkan permintaan
Tahun 2016 Mil Daya
Jerman, Dresden
Hubungi penjual
harga berdasarkan permintaan
Tahun 2014 Mil Daya
Jerman, Berlin
peralatan industri lain Itec SB - Cut peralatan industri lain Itec SB - Cut
2
Hubungi penjual
harga berdasarkan permintaan
Tahun 2016 Mil Daya
Jerman, Pullach
Hubungi penjual
harga berdasarkan permintaan
Tahun 2016 Mil 68804 m/h Daya
Jerman, Pullach
Hubungi penjual
harga berdasarkan permintaan
Tahun 2008 Mil Daya
Jerman, Pullach
peralatan industri lain Ludy Galvanomat
1
Hubungi penjual
harga berdasarkan permintaan
Tahun 2016 Mil Daya
Jerman, Dresden
Hubungi penjual
harga berdasarkan permintaan
Tahun 2009 Mil Daya
Jerman, Mörfelden Walldorf
Hubungi penjual
harga berdasarkan permintaan
Tahun 2009 Mil Daya
Jerman, Ahaus
Hubungi penjual
harga berdasarkan permintaan
Tahun 2009 Mil Daya
Jerman, Berlin
Hubungi penjual
harga berdasarkan permintaan
Tahun 2009 Mil Daya
Jerman, Berlin